Document what the design has to work around.
Project-specific topography, visible utilities and structures, manholes, flowlines, pavement, drainage features, tie-ins, and other required site information.
Municipal projects rarely start with a clean site. Utilities stay active, streets stay in service, records do not always match field conditions, and the survey has to work for the engineer designing the improvement and the contractor building it.
Eagle supports cities, public agencies, civil engineers, contractors, and developers delivering public improvements with surveying and Reality Capture aligned to the owner's standards, the construction needs, and the final record.
A sewer replacement, drainage improvement, roadway project, or facility upgrade can turn on a tie-in, benchmark, easement, buried feature, or field condition that never made it into the record drawings. The survey needs to resolve the information the design and construction teams will actually use.
Project-specific topography, visible utilities and structures, manholes, flowlines, pavement, drainage features, tie-ins, and other required site information.
Horizontal and vertical control can be established or verified so design, Construction Staking, field checks, and record work reference a consistent project basis.
As-built requirements should be identified early so required pipe, fittings, manholes, valves, structures, and other features can be observed at the right point in construction.
Coordinate system, datum, control, CAD or GIS conventions, feature coding, cut sheets, and digital-delivery requirements can be incorporated before mobilization when they apply.
Eagle supports municipal engineers, public owners, and contractors with corridor surveying, right-of-way work, easement exhibits and legal descriptions, construction layout, and Reality Capture on active infrastructure projects.
Eagle provided approximately 12,800 linear feet of right-of-way boundary and topographic surveying to support a municipal sewer and water rehabilitation project.
Eagle supports the active water-treatment-plant expansion with field and Reality Capture services coordinated around construction progress.
Eagle provided right-of-way boundary and topographic surveying for roadway widening and new lanes along Riney Road, along with boundary and topographic surveying for corridors supporting new city walking trails.
Survey support for street reconstruction, water-line rehabilitation, and sewer-line rehabilitation, including approximately 24,100 linear feet of boundary, topographic, and tree surveying.
Eagle is providing survey support for sewer replacement along Jupiter Road and water-line replacement in the Oak Hill Subdivision, including 9,603 linear feet of right-of-way topographic surveying.
Eagle is providing more than 11,000 linear feet of boundary, topographic, and tree surveying to support right-of-way and water-system rehabilitation.
One project may need conventional survey only. Another may benefit from aerial or terrestrial capture in addition to field survey. Eagle can coordinate the required scopes around the same project basis and intended engineering use.
Send the project limits, current plans or exhibits, the intended design use, owner or agency standards, available control information, required features, requested deliverable formats, target schedule, and known access constraints. For rehabilitation work, prior record drawings and available utility information are also useful.
Yes, when the existing control can be recovered and verified for the assignment. Eagle can review the project's horizontal and vertical basis, datum, benchmarks, and owner requirements before relying on them. If control needs to be supplemented or reestablished, that can be addressed in the survey scope.
Record drawings are useful starting information, but the design survey should document the field conditions included in the agreed scope. Eagle can locate and measure visible or accessible utility features, structures, tie-ins, and surface conditions and flag discrepancies that affect the survey. If subsurface utility investigation beyond normal survey observations is required, that should be coordinated as a separate project need.
That timing should be established before the critical features are covered. The contractor, inspector, owner, and survey team need to know which pipe locations, fittings, valves, structures, elevations, and coordinates are required so the observations can be made while those features are still accessible.
Yes, when access, safety, orientation, escort, and work-window requirements are coordinated before mobilization. The field approach can then be planned around the site's operating constraints and the specific information the engineering or construction team needs.
Yes, when the required standards are identified as part of the scope. Layering, feature coding, coordinate information, file structure, naming, attributes, and other digital-delivery requirements should be provided before fieldwork and drafting so the final files are built for the owner's workflow.
Send the limits, current plans, owner standards, available control, deliverable requirements, and schedule. Eagle can help define the survey and Reality Capture scope around the way the project will actually be designed, built, and documented.